Customization: | Available |
---|---|
After-sales Service: | Provide |
Warranty: | Provide |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
C & Z channel is meticulously crafted from premium galvanized steel strips using an advanced cold-bending method.
These channels are formed with precision, and the surface treatment options include either a robust galvanized finish or a sleek, bare option. They boast numerous advantages
over traditional structural steel, such as their remarkably light weight, outstanding
performance across various cross-sections, and incredible high-strength characteristics, making them ideal for modern construction needs.
We can provide product customization.
Please contact me now.
Please tell me your specific needs.
Product name | Building Material C Purlin High-Strength Galvanized Steel Purlin |
Shape | C chanel Z chanel |
Grade | Q195,Q235,Q345 |
Zinc coating | 40-275g or as client's requirement |
Length | 20'GP:no more than 5.8 meter/pcs 40'GP/40'HQ:no more than 11.8 meters/pcs |
Thickness | 1.3-3.0mm |
Size | 100×50×50×20 ; 120×50×50×20 ;140×50×50×20 ; 160×60×60×20 180×60×60×20 ; 200×60×60×20 ;220×70×60×20 ; 240×70×70×20 250×70×70×20 ; 280×70×70×20;300×80×80×20 |
Model NO. | Section size(mm) | Hole distance(mm) | Materials | ||||
C | B1 | B2 | C | Thickness | h | Q235 Q355 |
|
C80 | 80 | 40 | 40 | 15 | 1.3-3.0 | Don't punch | |
C100 | 100 | 50 | 50 | 20 | 1.3-3.0 | 40 | |
C120 | 120 | 50 | 50 | 20 | 1.3-3.0 | Adjusted | |
C140 | 140 | 50 | 50 | 20 | 1.3-3.0 | Adjusted | |
C160 | 160 | 60 | 60 | 20 | 1.3-3.0 | Adjusted | |
C180 | 180 | 60 | 60 | 20 | 1.3-3.0 | Adjusted | |
C200 | 200 | 60 | 60 | 20 | 1.3-3.0 | Adjusted | |
C220 | 220 | 70 | 70 | 20 | 1.3-3.0 | Adjusted | |
C250 | 250 | 70 | 70 | 20 | 1.3-3.0 | Adjusted |
Model NO. | Section size(mm) | Materials | ||||
C | B1 | B2 | C | Thickness | Q235 Q355 |
|
Z100 | 100 | 55 | 55 | 20 | 1.3-3.0 | |
Z120 | 120 | 55 | 55 | 20 | 1.3-3.0 | |
Z140 | 140 | 55 | 55 | 20 | 1.3-3.0 | |
Z150 | 150 | 67 | 67 | 20 | 1.3-3.0 | |
Z160 | 160 | 67 | 67 | 20 | 1.3-3.0 | |
Z180 | 180 | 67 | 67 | 20 | 1.3-3.0 | |
Z200 | 200 | 67 | 67 | 20 | 1.3-3.0 | |
Z250 | 250 | 78 | 78 | 20 | 1.3-3.0 | |
Z280 | 280 | 78 | 78 | 20 | 1.3-3.0 | |
Z300 | 300 | 78 | 78 | 20 | 1.3-3.0 |
The purlin production process is meticulously divided into three distinct stages:
Material Preparation: Our team ensures that the exact specifications of GI steel strips are meticulously prepared and expertly loaded onto the equipment, ready to commence the manufacturing process.
Equipment Preparation: Under the vigilant supervision of our workshop manager, a thorough check and fine-tuning of the equipment are conducted to guarantee that the C steel purlin machinery is optimally configured for production.
Processing: This stage encompasses several critical steps, including precision holes pre-punching, cold rolling, cutting to the specified length, and stacking in an organized manner for protection. The final step is a rigorous quality inspection conducted by our dedicated QC team to ensure excellence.
We will provide you with a quote immediately.
It is used widely as purlin and wall beam on steel structure construction.Also it can be combined into a light weight roof truss,brackets,etc.In machinery light manufacturing,C purlin can also be made into Column,beam or arm limb,etc.
We will provide you with a quote immediately.
Q:Are you a manufacturer or a trader?
A:We are a manufacturer.
Q:How can you guarantee quality?
A:We have a quality inspecting team.We also accept third party's inspection,SGS,BV,CICC,ITS,CTl.
Q:Can you provide samples?
A:Yes,we can provide free sample.
Q:Production cycle and delivery time:
A:Production will last for 20 to 40 days after we received your deposite.
Q:Shipping port
A:Tianjin port and Qingdao port.
Q:Payment term:
A:T/T,L/C at sight